Smith Specialized Logistics coordinated a move of a 3 story drilling platform that Samsung HD designed. The move took 6 nights total and had over 50 bucket trucks, 50 cops and 8 boom trucks to be able to lift the street lights and dissemble. Safety was the main priority to complete this move.
- Locations: Houston, TX to Seabrook, TX
- Date: August 2019
- W x H: 24′ x 27′
- Weight: 320,000 lbs